Preventive Maintenance

Preventive maintenance that follows how your machines actually run.

Schedule every PM on the trigger that matches its wear: calendar days, real run-hours, cycle counts or machine condition. Checklists at the machine, live overdue countdowns on the floor and the evidence your auditors ask for, on the same platform that measures your OEE.

Calendar · run-hours · cycles · conditionOverdue countdowns in hoursAudit-ready records
PM BOARD · TODAYLIVE
CAL
VMC-03
Electrical panel & earthing check
OVERDUE 6h 12m 00s
HRS
VMC-07
Spindle chiller filter clean
412 / 500 run-h
CYC
PRESS-2
Clutch-brake inspection
48,200 / 50,000 strokes
CBM
HMC-01
Spindle bearing inspection
Raised · health 68
CAL
COMP-1
Air-intake filter change
Due in 3 days
ILLUSTRATIVE DATACOMPLIANCE THIS MONTH 94% · 1 OVERDUE · 1 RAISED BY CONDITION
4 triggersCalendar, run-hours, cycle count and condition, mixed per machine
Hours-levelOverdue PMs counted down in hours, not discovered at the audit
MTBF · MTTRComputed automatically for every machine
1 tapFrom any alert to an owned maintenance task
Why PM programmes quietly fail

A PM schedule on paper is a list of good intentions.

Wrong interval

The calendar doesn't know the shift pattern

A 30-day PM is late on a machine running three shifts and early on one running one. Same task, same calendar, opposite mistakes.

Invisible skips

Skipped PMs vanish until they break something

Nobody decides to skip a PM. It slides behind production, then disappears. A live overdue count makes skipping a visible decision.

No evidence

“Done” means a tick, not a record

What was checked, which readings, what was found. Without that, PM compliance is a guess and an audit finding waiting to happen.

The four triggers

Match each task to what actually wears it out.

Lubrication wears with running time, dies wear with strokes, calibration drifts with the calendar and bearings wear on their own schedule. One machine can carry all four.

Trigger · CAL

Every N days, weeks or months

For tasks that age with time rather than use: electrical panel and earthing checks, safety devices, calibration and statutory inspections. The machine does not need to run for these to fall due.

Example task
Thermocouple calibration

Every 6 months

Example task
Electrical panel & earthing check

Every month

Example task
Fire and safety interlock test

Every quarter

What it needsNeeds nothing beyond the task library.
Mix freelyOne machine can carry all four trigger types at once
Try it

Is your calendar PM early or late on this machine?

Set the service interval the manufacturer gives in run-hours and the calendar interval you use today, then move the utilisation. The same calendar is wrong in opposite directions on busy and quiet machines.

Run-hour trigger falls due in
—
Hours run by calendar date
—
PMs / year · calendar
—
PMs / year · run-hours
—
RUN-HOURS AT CALENDAR DUE DATE
▍ = the service point in run-hours
How a PM runs

From task library to closed loop, without a register.

Plan

A task library per machine

Checklists by machine and machine type, with the steps, safety isolation, tools and spares each task needs.

Trigger

Due on the right signal

Calendar, run-hours, counts or condition. Tasks fall due by themselves; nobody maintains a spreadsheet of due dates.

Notify

The right person knows

Assigned technicians are alerted on WhatsApp or email, and overdue tasks escalate automatically.

Execute

Done at the machine

Step-by-step checklist with readings, notes and photos. The machine's PM time is recorded as planned maintenance, not a breakdown.

Verify

Signed off, not ticked

Supervisor sign-off closes the task. Every record is kept per machine and searchable for the audit.

Improve

Learn which PMs work

Compliance by machine and technician, MTBF and MTTR, and breakdowns that followed a PM, so intervals can be tuned.

What you can finally measure

PM compliance becomes a number, not an opinion.

Discipline
PM compliance

Share of PMs completed on time, per machine, line and technician. The first number an auditor asks for.

Exposure
Overdue hours

How long each overdue task has been waiting, counted live, so the most exposed machine is obvious.

Mix
Planned maintenance share

Planned maintenance hours as a share of all maintenance hours. It rises as breakdowns give way to PMs.

Reliability
MTBF

Mean time between failures per machine, computed from real breakdown records rather than estimates.

Response
MTTR

Mean time to repair, from stop to running again, including the wait for parts.

Effectiveness
Breakdowns after PM

Failures that followed a completed PM point to a checklist or interval that needs changing.

The difference

Why PM on a monitoring platform beats PM on a clipboard.

Paper or ExcelStandalone CMMSMachineWise
Knows real run-hoursNo · assumed from shiftsManual meter readings typed inYes · measured by monitoring
Counts cycles, strokes, shotsNoManual or via integrationAutomatic
Condition-triggered tasksNoRarely · separate systemBuilt in · same platform
Overdue visibilityAt the auditInside the appLive countdown on floor screens, plus alerts
Evidence of work doneA signatureVariesNotes, readings, photos and sign-off per task
Linked to OEE and breakdownsNoSeparate dataSame data · PM time is planned, not a breakdown
Audit-ready

The evidence is created by doing the work.

Auto-component suppliers are asked for total productive maintenance evidence under IATF 16949 (clause 8.5.1.5): planned maintenance objectives, their results, and records that the plan was followed. ISO 9001 (clause 7.1.3) asks for maintained infrastructure.

With MachineWise every PM carries who, when, what was checked, the readings and the photos, and compliance, MTBF and MTTR are already calculated. The audit pack comes from records that already exist, not a week of chasing signatures.

Breakdown workflow and help-desk tickets →

The maintenance maturity ladder

Five ways to maintain a machine. One platform runs all of them.

Most plants run all five at once on different machines, and that is correct. A spare-rich pump can run to failure; a constraint CNC cannot. MachineWise lets each machine sit on the stage its cost of failure justifies.

Questions

Straight answers.

What is preventive maintenance software?
Preventive maintenance software schedules routine maintenance tasks before failures happen, tracks whether they were done on time and keeps the evidence. MachineWise does this with task checklists per machine, four trigger types (calendar, real run-hours, cycle counts and machine condition), live overdue countdowns and completion records, all on the same platform that measures OEE and downtime.
What is the difference between preventive and predictive maintenance?
Preventive maintenance services a machine on a planned trigger, such as every 30 days, every 500 run-hours or every 50,000 strokes, whether or not the component is wearing. Predictive maintenance measures the component's condition and estimates when it will fail, so the service happens only when needed. Most plants need both: preventive for tasks that must happen regardless, predictive for their most critical rotating equipment.
Can preventive maintenance be scheduled on run-hours instead of the calendar?
Yes. MachineWise counts each machine's actual running hours from monitoring, so a task set for every 500 run-hours falls due after 500 real hours, whether that takes three weeks on a three-shift machine or three months on a single-shift one.
Do we need sensors for preventive maintenance?
Not for most of it. Calendar tasks need nothing extra, and run-hour and cycle-count triggers use the running time and counts MachineWise already records for OEE. Only condition-triggered tasks need condition sensors, such as vibration or temperature, on that asset.
Does it help with IATF 16949 and ISO 9001 audits?
Yes. Every PM is recorded with who did it, when, what was checked, the readings taken and any photos, which is the evidence auditors ask for under the total productive maintenance requirements of IATF 16949 (clause 8.5.1.5) and the infrastructure maintenance requirements of ISO 9001 (clause 7.1.3).
Can we start from our existing PM checklists?
Yes. Your current checklists and frequencies become the starting task library, and triggers can then be moved from calendar to run-hours or counts machine by machine where that fits the wear better.
Does preventive maintenance work without internet?
Yes. MachineWise runs on-premises on your plant network by default, so scheduling, checklists and overdue alerts on floor screens work without an outside connection.
Is preventive maintenance priced separately?
No. Preventive maintenance is part of maintenance management, which is included in the one MachineWise subscription with no per-module licence.
Ready when you are

Put your PM schedule on real run-hours this month.

A 30-minute walkthrough with your own checklists, then a free 2-machine pilot. Your data stays on-premises throughout.

Get a call back within one working day
No spam, no call centre. An engineer calls you.
FREE 2-MACHINE PILOT
Live OEE on two of your machines — this week. ₹0 to start.
Software-first setup in under an hour each · your data stays on-premises · plant-specific ROI model included.